Here’s a look at work planned in the district for the week starting March 13, 2023. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues. Motorists are advised to remain alert and pay special attention to all signs, barricades and traffic controls, and reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.
Paris Area (Delta, Lamar, Red River Counties)
Contacts: Paris Area Office (903) 784-1357; Delta Co. Maintenance (903) 395-2139; Lamar Co. Maintenance (903) 785-4468; Red River Co. Maintenance (903) 427-3561.
SH 37, Red River County: from US 82 to Texas-Oklahoma state line. Watch for temporary lane and shoulder closures while crews resurface the roadway and perform bridge maintenance.
FM 906, Lamar County: from FM 2648 to CR 47400. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.
FM 38, Lamar County: from US 82 to US 82. Watch for temporary lane and shoulder closures while crews improve drainage structures and upgrade bridge rail and metal-beam guard fence.
FM 1487, Red River County: from FM 909 to FM 910. Watch for temporary lane closures while crews widen and rehabilitate the existing pavement and improve drainage structures.
Loop 286, Lamar County: from FM 1497 around the North Loop to FM 1507. Watch for temporary lane and shoulder closures while crews improve guardrail and drainage structures, perform bridge maintenance and place bonded concrete surfacing.
Loop 286/US 271 South Interchange, Lamar County: from Dawn Drive going south to the North Loop 286 turn around. Watch for temporary lane and shoulder closures, lane shifts, and traffic merges while crews improve guardrail and perform bridge maintenance.
FM 64, Delta County: from FM 128 to SH 1532. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.
FM 2675, Delta County: from Lamar County line to FM 128. Watch for temporary lane closures while crews rehabilitate the existing pavement and improve drainage structures.
BU 271 (North Main Street), Lamar County: from Santa Fe Street to one-quarter mile north of Stone Avenue. Watch for temporary lane closures while crews install sidewalk.
FM 411, FM 1159, FM 1699, FM 2283, US 82 and US 37, Red River County: Watch for temporary lane closures while crews remove debris from recent storm damage.
FM 1499, FM 906, FM 2820, FM 79, FM 1510, US 271 North, and FM 197, Lamar County: Watch for temporary lane closures while crews remove debris from recent storm damage.
US 82, Lamar County: at the FM 1502 intersection. Watch for temporary lane closures and traffic/lane shifts as crews widen the roadway to install a left-turn lane and improve drainage structures.
Sherman Area (Fannin, Grayson Counties)
Contacts: Sherman Area Office (903) 892-6529; Grayson Co. Maintenance (903) 893-8831; Fannin Co. Maintenance (903) 583-7566.
US 75, Grayson County: from FM 1417 to SH 91 (Texoma Parkway). Watch for shoulder closures and lane shifts on the northbound and southbound US 75 main lanes between SH 91 and FM 1417 as crews work on building new main lanes, bridges, and retaining walls. Watch for lane closures on the frontage roads between FM 1417 and SH 91. A reduced speed limit of 60 mph on the US 75 mainlanes has been set for this construction project.
The westbound US 82 exit ramp for US 75 will be closed to traffic permanently on March 14. Travelers heading westbound on US 82 will use the current Loy Lake Road exit (642B) and follow the westbound frontage road to access US 75. The Loy Lake Road exit will serve as the new US 75 exit ramp.
The eastbound entrance ramp to US 82 at the US 75 intersection is closed to traffic. This ramp serves as the entrance ramp to eastbound US 82 at US 75. This closure is needed to complete the construction of the US 82 eastbound Frontage Road and new entrance ramp. Motorists are advised to use the eastbound frontage road and continue east through the Loy Lake intersection, and use the eastbound entrance ramp from Loy Lake Road to gain access to US 82.
The eastbound US 82 exit ramp to US 75 is temporarily closed in order for crews to make the connection of the new exit ramp to US 82 and the frontage roads. Motorists traveling eastbound on US 82 are advised to use the FM 131 / Travis Street exit (Exit 641) and follow the eastbound frontage road to access US 75.
The northbound and southbound US 75 frontage road intersections with Center Street have been converted to an all-way stop. Traffic on the frontage roads is asked to pay attention to the advanced warning signs and new stop signs, and approach the intersection prepared for a stop there.
Lamar Street and Houston Street under US 75 are closed to through traffic with detour signs in place to guide motorists around these intersections.
Eastbound Lamar Street traffic will turn right on the southbound US 75 frontage road, turn left on Center Street, and turn left on the northbound US 75 frontage road to return to eastbound Lamar Street. Video animation of this detour can be seen at the following link.
Westbound Houston Street traffic will turn right on the northbound US 75 frontage road, turn left on Washington Street, and turn left on the southbound US 75 frontage road to return to westbound Houston Street. Video animation of this detour can be seen at the following link.
These switches will allow crews to reconstruct the proposed US 75 mainlanes and the bridge over Lamar and Houston Streets. The US 75 northbound frontage road traffic is reduced to one travel lane, but two travel lanes remain for northbound US 75 mainlane traffic. A concrete barrier separates the northbound frontage road and mainlane traffic. Video animation of this alignment can be seen at the following link.
For southbound US 75 the frontage road traffic is reduced to one travel lane, but two travel lanes remain for southbound US 75 mainlane traffic. A concrete barrier separates the southbound frontage road and mainlane traffic. Video animation of this alignment can be seen at the following link.
US 75, Grayson County: at the US 82 intersection. Watch for shoulder closures on the northbound and southbound US 75 main lanes between South Loy Lake Road and Lamberth Street as crews work on building new exit and entrance ramps. Watch for shoulder closures and lane shifts on the eastbound and westbound US 82 main lanes between FM 131 and Loy Lake Road while crews work on building new exit and entrance ramps. Watch for lane closures and lane shifts for the frontage roads at the US 75 and US 82 intersection as crews work on construction of new frontage road lanes.
FM 1417, Grayson County: from US 82 to SH 56. Watch for lane shifts and shoulder closures between US 82 and SH 56 while crews construct the new roadway pavement. The ultimate roadway will be a four-lane divided section with turn lanes. A reduced speed limit of 45 mph has been set for this construction project. The West Cypress Grove Road intersection on the east side of FM 1417 is closed to through traffic to allow crews to work on paving at the intersection. During the closure, traffic wishing to use Cypress Grove Road is asked to use Mimosa Drive and Redbud Trail as a detour route. Mainlane traffic has been switched to the new concrete section between Lamberth Street and SH 56. The intersection of Washington Street on the west side of FM 1417 is closed to traffic in order for crews to complete the reconstruction of this intersection. During the closure, traffic wishing to use Washington Street is asked to use Taylor Street and Little Lane as a detour route. The Washington Street closure is expected to last three weeks, weather permitting.
US 82, Grayson County: at the Old Southmayd Road intersection. Watch for daytime lane closures as workers lengthen the existing left turn lanes on US 82 at the Old Southmayd Road intersection and add right-turn lanes.
SH 56 (Main Street), Grayson County: in Whitesboro from Union Street to Collinsville Street. Watch for daytime lane closures on SH 56 as crews work on the rehabilitation project to remove and replace the sidewalks and parking areas along the square. The contractor will work on one side at a time, with work beginning on the north side initially. During construction, the front entrances to the buildings will be temporarily closed and customers are asked to enter from the rear entrances. Occasional road closures will be required with a detour route in place to guide motorists around the project. The detour route will guide traffic along Union Street, Thode Street, and Collinsville Street to get around the project.
Roland Road, Grayson County: at the South Branch of Big Mineral Creek has been reopened to traffic as crews have finished construction on the bridge replacement.
South Travis Street, Grayson County: in Sherman at Post Oak Creek. Construction is underway for the South Travis Street bridge over Post Oak Creek. During construction, the bridge will be reduced to one lane with traffic signals controlling traffic through the project, while the new bridge is built in phases.
Business US 377B, Grayson County: south of Whitesboro at the railroad underpass near US 377. Watch for lane closures with signals controlling traffic while crews work to upgrade the bridge railing.
US 75 full depth concrete repair, Grayson County: Crews will be working on US 75 each week from Sunday night through Friday morning during the overnight period. Lane closures will be present at night for crews to replace failed concrete sections. Lane closures will begin at 7:30 p.m. each night and should be reopened to traffic by 6 a.m. This work will extend from the Collin-Grayson County line to the Oklahoma State line.
FS 121 (Grayson Parkway), Grayson County: from the Collin County line to FM 121. Construction is ongoing on this new-location roadway which is west of SH 289 approximately four miles. The new roadway will be two lanes with shoulders and will be an extension of the frontage road of the Dallas North Tollway. Local traffic on CR 60 (Marilee Road) and Stiff Chapel Road should expect occasional road work at those intersections, with flaggers present to control traffic. Work on FM 121 at the FS 121 intersection (formerly Scharff Road intersection) is ongoing as crews work to widen the pavement to add turn lanes. Motorists on FM 121 should expect lane shifts while crews widen the pavement and install a culvert.
US 75 debris pickup, Grayson County: from Collin County line to Oklahoma State line. Watch for mobile lane closures as workers pick up debris from the roadway every Monday and Thursday during the nighttime.
US 75 frontage roads, Grayson County: from the Collin County line to FM 1417. Watch for daytime lane closures as crews perform base repairs on the roadway. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
FM 121, Grayson County: from US 377 to SH 289. Watch for daytime lane closures as maintenance crews perform base repairs and blade level the roadway with hotmix. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
SH 56, Grayson County: from the Fannin County line to Sherman. Watch for daytime lane closures as crews perform spot milling on the roadway to remove rough spots. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
CR 1320, Fannin County: at the Caney Creek Bridge is closed to traffic in order for crews to replace the bridge structure and approaches.
FM 271, Fannin County: from SH 78 to FM 68. Watch for daytime lane closures as crews work to rehabilitate and widen the roadway. Motorists should expect delays as signals and pilot cars direct traffic through the work zone.
SH 34, Fannin County: from FM 64 to FM 1550. Watch for traffic shifts and traffic signal controlled lane closures as workers build the bridge approaches for the new SH 34 roadway at the future Lake Ralph Hall.
FM 1550, Fannin County: from SH 34 to CR 3544. Watch for daytime lane closures as crews work on building the connection of the realigned FM 1550 to the existing roadway. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
FM 824, Fannin County: from SH 56 in Honey Grove to the Lamar County line. Watch for temporary one-lane closures as workers rehab and widen the roadway.
FM 2645, Fannin County: from FM 1753 to FM 898. Watch for daytime lane closures as maintenance crews perform base repairs on the roadway. Motorists should expect delays as flaggers and pilot cars direct traffic through the work zone.
Sulphur Springs Area (Hopkins, Franklin Counties):
Contacts: Sulphur Springs Area Office (903) 885-9514; Franklin Co. Maintenance (903) 537-4976; Hopkins Co. Maintenance (903) 885-4031.
FM 1536, Hopkins County: from SH 19 to FM 71. Watch for lane closures and short delays as crews place pavement markings on the roadway.
Greenville Area (Hunt, Rains Counties)
Contacts: Greenville Area Office (903) 455-2363; Hunt Co. Maintenance (903) 455-2303; Rains Co. Maintenance (903) 473-2682.
FM 2649, Hunt County (From IH30 to FM 1567): Contractors have set barricades and work zone traffic signs. Contractor plans to begin culvert and prep right of way work soon. Please be aware of workers and watch for work zones when traveling in this area.
CR 1032, 1031 and 2132 bridge replacement project, Hunt County. The contractor has set barricades and advance warning signs. The contractor has reopened the CR 1032 and CR 2132 bridge. The contractor will begin work on CR 1031 soon. Please be aware of workers and watch for work zones when traveling in this area.
SH 224, Hunt County: The contractor has placed final hot mix, poured the mow strip and installed metal beam guard fence. All structural work is completed. Contractor plans to stripe project soon and some minor cleanup has begun at this location. Contractor plans to complete this project by the end of March. Please be aware of this construction, detour route and workers in the area.
FM 275, Rains County: from SH 19 to FM 514. The contractor worked on installing small signs and mailboxes and began project and stockpile clean up. The contractor is planning to form three driveways and install some delineation on the project cross culverts. Please be aware of workers and watch for work zones when traveling in this area.
SH 276, Hunt County: from FM 36 to SH 34 (Quinlan Bypass). The contractor was able to open west and east bound lanes of the SH 276 Bypass. Contractor plans to begin removal of parts of old Business 276. Flexbase work will begin on the tie ins of the bypass and existing SH 276. Please be aware of lane closures and changes to current traffic configuration and watch for work zones and workers when traveling in this area.
SH 66, Hunt County: SH 66 at FM 1570, SH 34 at FM 1570. The contractor completed long line striping and placed reflective pavement markings at FM 1570 and FM 1903 intersections. Some embankment work will begin soon and repair to transitions along pavement joints are being worked on. The signal poles are on hold until April due to supply chain issues.
Maintenance crews for both Hunt and Rains County will be performing various sign and mailbox installations on various roads. Rains County crews will be working seal prep patching on FM 2101 and various bridge and culvert maintenance projects throughout the county. Hunt crews are addressing the removal of a turnaround at SH 24. Both crews are addressing potholes and roadway complaints. Please be careful when traveling in these areas, watch out for workers and maintain a safe distance from work crews.